Lane Closures, Rolling Roadblock for I-75 Work in Kentucky

The Kentucky Transportation Cabinet (KYTC) reports that the contractor for the bridge overlay project at I-71/75 and I-275 has announced the following schedule: Wednesday, November 29: 9:00 p.m. to 2:00 a.m.: I-275 eastbound left lane closure near the 83.7 mile point. 10:00 p.m.: read more... The article: Lane Closures, Rolling Roadblock for I-75 Work in Kentucky, was originally published on I-75 Exit Guide
image-.jpg

The Kentucky Transportation Cabinet (KYTC) reports that the contractor for the bridge overlay project at I-71/75 and I-275 has announced the following schedule:

Wednesday, November 29:

9:00 p.m. to 2:00 a.m.: I-275 eastbound left lane closure near the 83.7 mile point.

10:00 p.m.: read more…

The article: Lane Closures, Rolling Roadblock for I-75 Work in Kentucky, was originally published on I-75 Exit Guide

Facebook
Twitter
LinkedIn
Pinterest